Salvis were commissioned by Hyndburn Borough Council to undergo multiple projects at Scaitcliffe House to include:

  • Detailed feasibility study
  • Supporting an application to the Public Sector Decarbonisation Scheme, leading to the successful award of grant funding
  • Thermal modelling using IES software
  • Detailed design and project management for:
    • VRF for heating and cooling
    • 20 kWp PV
    • LED lighting throughout

Project Description

The feasibility study investigated how the Council could decarbonise the building with recommendations including: 

  • Retain the existing Daikin heat pump in selected areas.
  • Decommission the rest of the ageing existing heat pump system and electric panel heaters.
  • Replace with Variable Refrigerant Flow (VRF) to provide space for heating and cooling with greater efficiency. Carbon savings in Year 1 = 7.0 tCO2e
  • Replace fluorescent light fittings with LED. Carbon savings in Year 1 = 4.4 tCO2e
  • Extend the existing solar panel arrays with an additional 20 kWp sized system. Carbon savings in Year 1 = 2.1 tCO2e

Salvis then were asked to support the Council with their application to the Public Sector Decarbonisation Scheme and undertake the design and project management work for the recommended proposals. 